今天为大家揭晓我们的新项目,气膜结构搭建的元宇宙主题馆,目前该项目已完成吹气,周围配套的主题乐园和馆内建设正在紧密的进行中,浅浅期待一下完成后的效果吧!
当前,数字经济已进入快速发展期,数字技术取得重大突破,实体经济与数字技术融合态势日益深入,而元宇宙是整合多种数字技术产生的下一代互联网应用和社会形态,是人工智能、区块链、大数据、5G、VR/AR/XR、云计算、互联网、数字孪生等数字技术达到一定程度后的产物。
Date: 2024-06-06 Author: 科琦气膜
今天为大家揭晓我们的新项目,气膜结构搭建的元宇宙主题馆,目前该项目已完成吹气,周围配套的主题乐园和馆内建设正在紧密的进行中,浅浅期待一下完成后的效果吧!
当前,数字经济已进入快速发展期,数字技术取得重大突破,实体经济与数字技术融合态势日益深入,而元宇宙是整合多种数字技术产生的下一代互联网应用和社会形态,是人工智能、区块链、大数据、5G、VR/AR/XR、云计算、互联网、数字孪生等数字技术达到一定程度后的产物。
Ms. Liao:
What maintenance is needed for an air membrane basketball hall after construction?
A: An air-supported basketball gym is a type of air-supported building and air-supported sports facility. It maintains a constant temperature and humidity year-round, and features many advantages such as light weight, large span, fast construc...
Mr. Wang:
Overview of air membrane buildings
A: Air membrane buildings are far less long-standing than traditional buildings in terms of development history, but they are a great progress of human civilization. People are still unfamiliar with air membrane buildings, so what are air memb...
Mr. Ren:
What are the advantages of air membrane buildings?
A: The internal space has no beams or columns, which can effectively improve the utilization rate of the original building; the membrane material has the functions of windproof, snowproof, haze-proof, fireproof, shockproof, etc.; low cost, sho...
Mr. Yu:
Are air membrane buildings safe? What about fire protection design?
A: The roof load-bearing components of air membrane buildings are fire-retardant materials, and the fire resistance rating of the project is determined as Grade III, which is equivalent to the brick-wood structure composed of wooden roof and b...
A: Small damage to the air membrane structure building will not affect the safety of the building itself, and timely repair can solve the problem. If a large hole (with an area of more than 1 square meter) is punctured, the air pressure inside...
Mr. Dong:
Approval and construction procedures for air membrane buildings in China
A: The approval procedure for air membrane buildings is relatively simple, and the submission and approval are carried out according to the nature of temporary buildings. According to the policy differences in each region, the approval and fil...
![]()
![]()